My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5805 HIGHWAY PL 2019-03-18
>
Address Records
>
HIGHWAY PL
>
5805
>
5805 HIGHWAY PL 2019-03-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 9:28:43 AM
Creation date
3/29/2018 1:42:46 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description of proposed erosion control BMP's: <br /> • Clearing, grading, and temporary erosion and sediment control plans have been prepared as part of the <br /> drainage plan drawings. However, since a construction site is dynamic it will be necessary to <br /> reassess the erosion control BMP's during construction and install additional measures when <br /> necessary. <br /> Proposed temporary measures possible for this project will include the following BMP's: <br /> Installation of stabilized rock construction entrance. <br /> Straw mulch,hydroseed or other mulching and planting method to stabilized unworked areas. <br /> Retention of vegetation around site. <br /> Silt fence <br /> CB inlet protection. <br /> Permanent measures to reduce or eliminate erosion or water quality degradation will include the <br /> following BMP's: <br /> Paving all traffic areas (Asphalt) <br /> Permanent landscaping in pervious areas. <br /> Limiting cut and fill slopes to 2:1 maximum and 3:1 maximum where exposed to standing water. <br /> Routine maintenance and inspection of the grounds and response to developing problems. <br /> The listed erosion control BMP's will be engineered for anticipated conditions in compliance with <br /> The City of Everett and DOE guidelines.With proper installation, maintenance and inspection the <br /> proposed BMP's should result in minimal impact to the surrounding environment The County retains the <br /> authority by code to require additional measures should the existing measures prove insufficient. <br /> SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: approx. 0.2238 acres <br /> Average slope for the site: 2% <br /> Erosion Hazard of Soil low <br /> Critical Areas downslope No <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the construction site runoff will be collected <br /> on-site, and with the implementation of the BMP's listed and that if site conditions warrant, <br /> additional BMP's can be implemented as corrective measures the Risk Category for this site is <br /> Low Risk. <br /> With the BMP's listed in section B and shown on the site plan, it is anticipated that this site <br /> will have little impact on the downstream system. <br /> V. Source Control Plan <br /> The following worksheet is completed by checking the appropriate boxes for all activities that will or may <br /> occur at the project site. <br /> Following the spread sheet is a list of the required and suggested BMP's for each activity. .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.