My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5805 HIGHWAY PL 2019-03-18
>
Address Records
>
HIGHWAY PL
>
5805
>
5805 HIGHWAY PL 2019-03-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 9:28:43 AM
Creation date
3/29/2018 1:42:46 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5805
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Stormwater Treatment Plan <br /> Per the City of Everett Standards,no stormwater treatment facilities are required for projects <br /> located within the Combined drainage basin. No treatment plan is provided as part of this project. <br /> F. Conveyance Analysis <br /> See Appendix B <br /> G. Maintenance and Operation Plan <br /> The City of Everett requires the owner or operator of the project drainage facility to maintain <br /> the facility in accordance with the City Maintenance Checklists. <br /> The following pages contain maintenance needs for components included in the project that <br /> are part of a drainage system. Those components must be contained within the project's <br /> Maintenance Plan.The property owner shall plan to complete a checklist for all system <br /> components on the following schedule: <br /> (M)Monthly from October through April. <br /> (A) Once in late summer(preferably September). <br /> (S)After any major storm(use 1 inch in 24 hours as a guideline). <br /> Photocopies of these pages shall be used and checked off for the problems looked for each <br /> time an inspection is completed. Comments on problems found and actions taken shall be <br /> noted. Some items do not need to be looked at every time an inspection is done. The <br /> suggested frequency at the left of each item shall be used as a guideline for inspections. <br /> The"checked" sheets shall be kept by the property owner and made available to the City <br /> upon request. <br /> The facility-specific maintenance standards contained here are intended to be conditions for <br /> determining if maintenance actions are required as identified through inspection.They are <br /> not intended to be measures of the facility's required condition at all times between <br /> inspections.In other words,exceedance of these conditions at any time between inspections <br /> and/or maintenance does not automatically constitute a violation of these standards. <br /> However,based upon inspection observations,the inspection and maintenance schedules <br /> shall be adjusted to minimize the length of time that a facility is in a condition that requires a <br /> maintenance action. <br /> Maintenance checklists are provided for the following types of facilities/structures: <br /> Closed Detention Systems <br /> Control Structure/Flow Restrictor <br /> Catch Basin <br />
The URL can be used to link to this page
Your browser does not support the video tag.