My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4418 29TH AVE SE 2018-03-29
>
Address Records
>
29TH AVE SE
>
4418
>
4418 29TH AVE SE 2018-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:42:50 PM
Creation date
3/29/2018 3:42:47 PM
Metadata
Fields
Template:
Address Document
Street Name
29TH AVE SE
Street Number
4418
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT DFR 067 <br /> EO PHOTO LOG Date: 8�2 5�of 5 <br /> ,h <br /> i\: <br /> 2 <br /> it <br /> a, <br /> l .'� air, .- :-.;.7.--,,---,-7,-,,:,-, :‘,,,,4::-. <br /> ,;.7.-.,µ <br /> B <br /> a - 'a <br /> y <br /> ' .,iii..,',. <br /> p a ': .- :rye �.•..: -. u.u.�:.a .. iT,.ff �... <br /> M r'6 a iF. '✓ <br /> � ice.I� T^'y �b n ���xy,l'�^ <br /> Comments: Lot 246 Backfilling of east 1/3 of over Comments: Lot 246 Backfilling of east 1/3 of over- <br /> excavated lot area with cement treated material; �18 inch excavated lot area with cement treated material; —18 inch <br /> loose lifts loose lifts <br /> ��' ��,,� ' � <br /> T <br /> ,.� a ate`° <br /> � ' ' .,, <br /> Ir'�, <br /> a <br /> Comments: Lot 246 Compacted backfill material for east Comments: Lot 246 Base of over-excavated area for <br /> 1/3 of lot area to near plan bottom of footing center 1/3 of lot area. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the <br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does <br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our f rm is not responsible for site safety. This field report is a <br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The reportcan only be considered final upon review of the <br /> Ge- <br /> on <br /> project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.