Laserfiche WebLink
INSPECTION REPORT <br /> % Date 121 l Permit: O _6 2.41 <br /> Contractor: <br /> Owner: iab (/l1 <br /> Site Address: ✓ 3 3 Y)`& OK <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> • •• •'•e'N ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> •Ceiling Gni• ❑Drywall Nailing ❑Plumbing Final <br /> ,�,Electrical Final ❑Shear Nailing GAS PIPE <br /> TE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> III .. '•: . ains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER i <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED 00 OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 ho r notice required <br /> ,f <br /> Inspector: LIIP' �, Date: I� )Z{( <br /> EIR(10/06) / 7 DATABAR,INC. <br />