Laserfiche WebLink
iN/air..-,* INSPECTION REPORT <br /> Date 10 L' `i' Permit: c-1 b Co" O 66 <br /> Contractor: I <br /> Owner: P� I v//l ' <br /> Site Address: l LA L61 b l&. , 0,,ut ..c4:1,1,19_, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing M Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear NailingAS PIPE <br /> SITE WORK ❑Roof Nailing [dough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> e•P:•VAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> • OK FOR T.C.O. ❑ CORRECTION REQUESTED Elff, OK FOR C.O. El VIOLATION <br /> II UNABLE TO PERFORM INSPECTION: <br /> ■ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> A._ 4-- , <br /> E. d ,,, <br /> Dz On p .o f5-..n-- <br /> e ;, <br /> 7. <br /> ........_____.: <br /> / v _' <br /> Inspector: / -• e: / 7,./7 r/7 <br /> EW (10/06) DATABA ,INC. <br />