�1bkx Sk S } OALorz_ <br /> - <br /> [ ' DESIGN z FIELD REP• <br /> Project Name: Everett River Front-Simpson Report: 034 <br /> GeoDesign#: Polygon-127-03 Date: 05/02/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW 1505-005 <br /> vJ\ cM- oma• <br /> &mom Aut.vallemeirm, t a"3 ,a"5:, . d it4,4. tut., <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear,50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1530/1700 <br /> Distribution: - . .. ._ _._ . �. .w�.,. . <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg <br /> Attachments: m Site Plan(s) m Density Test Summary Signature: <br /> Installation Records [,I Other Reviewed By: y2 ' <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg,was on-site part time at the request of Craig with DDS to <br /> observe the foundation subgrade for Lots 226,236,237, 261, 262. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 226: <br /> Previously, GeoDesign identified material along the north and east side of Lot 226 which could be probed 6 inches to 1 foot <br /> and which was compacted to less than 95%of its maximum dry density as determined by a Modified Proctor analysis <br /> (maximum dry density). Today, GeoDesign noted that DDS had over-excavated the previously identified areas down to a <br /> gray to gray-brown silty SAND (f-m)with gravel (f-c)which could be probed less than 1 inch using a 1/2 inch diameter soil <br /> probe. <br /> Relative compaction of the over-excavated footing subgrade material was tested using a Troxler Moisture-Density gauge; <br /> in-place density tests indicated that the material had been compacted to greater than 95%of its maximum dry density. <br /> Craig with DDS stated that the over-excavated areas would be backfilled with a crushed rock or recycled concrete material <br /> later this week. GeoDesign notified the contractor that the over-excavated areas were currently suitable to place backfill <br /> material. <br /> Lot 236: <br /> Upon arrival, GeoDesign noted that DDS had completed excavation of the footing and crawl space area for Lot 236. Craig <br /> with DDS over-excavated the east 1/3 of lot area approximately 6 inches due the presence of loose saturated material. <br /> DDS also over-excavated an approximately 15 feet long x 5 feet wide x 2.5 feet deep section at the west end of the south <br /> side of the lot. GeoDesign noted that the exposed foundation subgrade consisted of a gray to gray-brown silty SAND(f-m) <br /> with gravel (f-c)which could generally be probed less than 2 inches using a 1/2 inch diameter soil probe. In-place density <br /> tests indicated that exposed foundation subgrade material had been compacted to greater than 95%of its maximum dry <br /> density. <br /> Craig with DDS stated that the over-excavated areas would be backfilled with a crushed rock or recycled concrete material <br /> later this week.GeoDesign notified the contractor that the over-excavated areas were currently suitable to place backfill <br /> material. <br /> Lot 237: <br /> Upon arrival,GeoDesign noted that DDS had was in the process of excavating the footing and crawl space area for Lot <br /> 237. GeoDesign noted that the exposed foundation subgrade consisted of a gray to dark brown silty SAND(f-m)with <br /> gravel (f-c)which could generally be probed less than 2 inches using a 1/2 inch diameter soil probe. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not Include supervision or direction of the contractor,the contractor's employees <br /> or agents.Our firm Is not responsible for site safety,This field report Is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by Initials in the"Reviewed By"section, <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />