My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br /> z <br /> CITY OF EVERETT <br /> NOTICE OF ISSUANCE <br /> PLANNED ACTION DETERMINATION <br /> SEPA16-001 <br /> The City of Everett Planning Director designated the following project as a Planned Action <br /> pursuant to RCW 43.21C.031(2)(a) and City of Everett Ordinance No. 2213-97. A SEPA <br /> threshold determination is not required for this proposal per 43.21 C.031 RCW. <br /> DESCRIPTION OF PROPOSAL: Office and manufacturing facility of approximately 70,000 s.f. <br /> floor area and 193 parking space. The project includes construction of a stormwater detention <br /> pond and will implement a wetland/buffer enhancement plan approved as part of a previous <br /> Binding Site Plan approval. <br /> PROPONENT: MTorres America <br /> 21520 30th Dr SE#210 <br /> Bothell, WA 98021 <br /> LOCATION: 900 BIk 80th Street SW <br /> ZONING: M-1, Office and Industrial Park <br /> GENERAL PLAN: 5.4: Office and Industrial Park <br /> The City of Everett Planning and Community Development Director has determined that: <br /> • The project is located within the boundaries of the Southwest Everett Subarea Plan. <br /> • The zoning designation of the property upon which the project is proposed is consistent with <br /> those designations analyzed in the Southwest Everett/Paine Field Subarea Plan and EIS, <br /> December 1996. <br /> • The proposed use is consistent with the uses and intensities allowed in the City's <br /> development regulations and is listed as a use analyzed in the final EIS, Tables 3.1-1 and <br /> 3.1-2. <br /> • The project is-a use that implements the Subarea Plan; and the project's significant <br /> environmental impacts have been adequately addressed in the SW Everett/Paine Field <br /> Subarea Plan EIS. <br /> •., The project's significant adverse environmental impacts will be mitigated through the, <br /> application of the mitigation decision document. These mitigation measures, along with <br /> other City requirements and conditions, constitute sufficient mitigation for the significant <br /> environmental impacts associated with the proposed project. <br /> • The,proposed project must comply with all applicable local, state and federal regulations <br /> and development standards. <br /> • The,proposed project is not an essential public facility. <br /> This is a courtesy notice to provide you with information regarding the proposal. Additional <br /> information can be reviewed at the Planning and Community Development Department office.at <br /> 2930 Wetmore, Suite 8-A. There is no public comment period for this proposal. There is no <br /> administrative appeal provided for this determination. If you have any questions about the <br /> proposal, please call John Jimerson at(425) 257-8731. <br /> 2930 Wetmore Avenue,Suite 8-A,Everett,WA 98201044 W(425)257-8731,Fax(425)257-8742 <br />
The URL can be used to link to this page
Your browser does not support the video tag.