My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
...� 00-16-11601-iii) 11:0° <br /> T ,. 1 <br /> PEPHIT <br /> }8rcayn <br /> rr PIC $19.768.51 <br /> .4017 TL $19,768.51 <br /> (425)257-8810 raI,K 1i9,7-Bn51 <br /> Plan Check No.: B1608-080 <br /> Application Date: 8/18/2016 <br /> Tenant: MTORRES AMERICA <br /> Owner: PACIFICA ENGINEERING INC <br /> Job Address: 905 80TH ST SW <br /> Proposed Use: NEW COMMERCIAL <br /> Description of Work: FOUNDATION&BUILDING-MTORRES <br /> AMERICA <br /> Plan Check Fee Paid: $19,768.51 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> /5;0' <br /> 5( 'SI 16 <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.