Laserfiche WebLink
PUBLIC ORKS PERMIT <br /> Date: 3/22/2016 <br /> City of Everett Public Works Department Public Works Permit#: PW1603-050 <br /> 3200 Cedar Street Parent Permit#: <br /> -7-17 Everett, WA 98201 <br /> (425)257-8810 Planning Reference#: <br /> Public Works Fee$: $ 72,111.90 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MTORRES AMERICA MTORRES AMERICA <br /> 21530 30TH DR SE, STE 210 21530 30TH DR SE, STE 210 <br /> BOTHELL WA 98021 BOTHELL WA 98021 <br /> PHONE: 4259842700 PHONE: 4259842700 <br /> TAX PARCEL ID# SITE ADDRESS: 905 80TH ST SW <br /> MTORRES MANUFACTURING BUILDING <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 6/29/2016. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 <br /> prior to starting construction and with other inspection requests. [�I <br /> 7. Keep City streets clean at all times. No dirt/rocks/debris to be tracked onto roadway. H <br /> 8. A stop sign must be added to each access point. <br /> 9. Consult with the City's Traffic Engineering Department (425-257-2277) to coordinate <br /> haul routes and any traffic control plans, and obtain any necessary road/lane closure <br /> permits prior to roadway distubance. <br /> 10. On-site watermain will be staked within an easement to the City. The easement <br /> must be recorded prior to final inspection. ►Z <br /> 10. As-builts of storm sewer, sanitary sewer, and water systems will be required to be <br /> submitted per City Design and Construction Standards and Specifications for <br /> Development. e Liz rn., <br /> Public Works Permit Fee Breakdown: <br /> Grade/Fill/Excavate (158,000CY) $1,385.00 Ai! 0 $ 2016 <br /> Paving (199,800SF) $999.00 1•■• <br /> PW Plan Review $5,805.30 <br /> PW Site Inspection $11,610.60 CITY midRE�f T <br /> Permit Services <br /> Traffic Mitigation $52,312.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> n The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> ( 711461/ <br /> 11 C' Rs <br /> nu n� City of Everett from any and all claims for damages,costs,expenses,or <br /> 'U,�`/rt/{// oC causes of action that may arise because of installation and maintenance of the <br /> Approved for Construction mate remove <br /> or other right-of-way use hereto applied for and further agrees to <br /> remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date , _ <br /> Approved as Constructed Signature of 4. �7rDate /� <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PE'/ IT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY TOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATIO1:"`�' <br />