My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> MTorres America Building <br /> 80th Street SW <br /> Everett,Washington <br /> 1.0 PROJECT DESCRIPTION <br /> The proposed project is a two-story industrial/manufacturing building with associated utility improvements and <br /> paved parking and access. Based on review of a grading and drainage plan prepared by PacLand dated December <br /> 18, 2015, we understand that the building,will be located in the southern portion of the site. The lower building <br /> level will be constructed,at elevation 546 feet, with an upper office floor elevation at 561 feet. Parking and <br /> access will be constructed south of the building. The area to the north of the building will be graded nearly level <br /> for additional parking and future building addition. <br /> Existing topography shown on the grading and drainage plan indicate that cuts and fills on the order of 15 feet <br /> will be required to establish building elevations in the south and north areas of the site, respectively. Grade <br /> transitions will be accommodated with retaining walls and sloped embankments. Proposed surface grades north <br /> of the building pad will slope.down to the north at a gradient of 3:1 (Horizontal:Vertical) to a stormwater <br /> detention pond. <br /> The detention pond will be formed entirely by excavations below existing surface grades with a maximum <br /> excavation depth of about eight feet. Interior pond slopes are shown graded to an inclination of 3;1 <br /> (Horizontal:Vertical), except for the slope at the eastern end of the pond,which is shown graded to an inclination <br /> of 2:1 (Horizontal:Vertical). <br /> The recommendations in the following sections of this report are based on our understanding of the design <br /> features outlined above. We should review design drawings as they become available to verify that our <br /> recommendations have been properly interpreted and to supplement them,if required. <br /> 2:0 SCOPE OF WORK <br /> Our work was completed in accordance with our authorized proposal dated January 11, 2016. Using the <br /> information obtained from our subsurface exploration, we performed analyses to develop geotechnical <br /> recommendations for project design and construction. Specifically,this report addresses the following: <br /> Soil and groundwater conditions <br /> • Geologic Hazards per the City of Everett Municipal Code <br /> • Seismic design parameters per the current International Building Code(IBC): <br /> • Site preparation and grading <br /> • Excavations <br /> • Foundations <br />
The URL can be used to link to this page
Your browser does not support the video tag.