My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW MTORRES AMERICA 2018-09-18
>
Address Records
>
80TH ST SW
>
905
>
MTORRES AMERICA
>
905 80TH ST SW MTORRES AMERICA 2018-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 8:45:35 AM
Creation date
3/30/2018 2:31:54 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
MTORRES AMERICA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 22,2016 <br /> Project No.T-7364 <br /> 5.0 ADDITIONAL SERVICES <br /> Terra Associates,Inca should review the final design drawings and specifications in order to verify that earthwork <br /> and foundation recommendations have been properly interpreted and implemented in project design. We should <br /> also provide geotechnical services during construction to observe compliance with our design concepts, <br /> specifications, and recommendations. This will allow for design changes if subsurface conditions differ from <br /> those anticipated prior to the start of construction. <br /> 6.0 LIMITATIONS <br /> We prepared this report in accordance with generally accepted geotechnical engineering practices. No other <br /> warranty, expressed or implied,is made. This report is the copyrighted property of Terra Associates, Inc. and is <br /> intended for specific application to the MTorres America project in Everett, Washington. This report is for the <br /> exclusive use of MTorres America and their authorized representatives. No other warranty,expressed or implied, <br /> is made. <br /> The analyses and recommendations presented in this report are based on data obtained from the test pits <br /> excavated at the site. Variations in soil conditions can occur, the nature and extent of which may not become <br /> evident until construction. If variations appear evident, Terra Associates, Inc. should be requested to reevaluate <br /> the recommendations in this report prior to proceeding with construction. <br /> Page No. 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.