Laserfiche WebLink
PUBLIC WORK <br /> It4-4 ,91tReficeitWAmomil,:, <br /> , ,14„ <br /> Construction Storm Drainage <br /> Temporary Silt Fence L.F. 160 5.00 $800 <br /> Grading for drainage swales L.F. 2.00 <br /> Other <br /> Other <br /> Construction Storm Drainage Total $ $800 <br /> Clearing &Grading <br /> 12"wide area L.F. 2.50 <br /> Right-of-Way L.F. 120 12.00 $1,440 <br /> Other(total net cut/fill) C.Y. see previous See EMC <br /> page 13.80.010 <br /> Clearing and Grading Total: $ $1,440 <br /> \I° <br />