Laserfiche WebLink
11400 SE 8th Street P 425-453-9501 <br /> Suite 345 F 425-453-8208 • A , <br /> Bellevue,WA 98004 WWW.PACLAND.COM , <br /> Memorandum pk)ic,c-13-050 <br /> Date: June 27, 2016 \\ SQ,SON <br /> <vti ,ti°fWA <br /> To: City of Everett _4k' t 71 f- k <br /> _ ''~ I <br /> From: Jared VerHey, P.E. ��a37 <br /> sIONAI. <br /> Subject: MTorres America — Storm Pond Design <br /> OVERVIEW <br /> The project site is generally located between 80th Street SW and Hardeson Road (east and <br /> west) and commercial properties (north and south). The project is 16.33 acres and located in <br /> the City of Everett. It was previously designed and the storm drainage partially constructed <br /> under "Hardeson Road Business Park— Phase 1" project. The existing drainage report is <br /> dated March 12, 2007 and construction drawings are dated January 27, 2008 and were <br /> prepared by Berg Engineering located in Marysville, WA. <br /> It is PACLAND's understanding that the storm drainage for this site was previously approved, <br /> permitted and vested by the City of Everett as part of the Hardeson Road Business Park— <br /> Phase 1 project, SEPA 06-067 and City of Everett Public Works Permit PW0706-007. <br /> The purpose of this memorandum is to summarize the differences from the Hardeson Road <br /> Business Park— Phase 1 plans and report and proposed conditions on the MTorres America <br /> project. <br /> HARDESON ROAD BUSINESS PARK— PHASE 1 IMPROVEMENTS <br /> The stormwater detention and water quality pond were sized for two buildings (C1 and C2) and <br /> associated parking and access roadways. The total impervious area proposed and designed <br /> for in the Berg Engineering plans has been summarized in the table below. <br /> Berg Engineering Report 2007 <br /> Parcel # Imp. Area Acres <br /> Cl 195530 4.49 <br /> C2 133958 3.08 <br /> Total 7.56 <br /> 1 of <br />