Laserfiche WebLink
Conveyance Calculation WSU NPSE Asphalt Parking Lot-Big J's Site I 6/28/2016 _ <br /> 25 YR <br /> System Runoff Capacity Check <br /> Runoff Rainfall Pipe Pipe <br /> From To Upstream Downstream SD Pipe Drainage Coefficient Tc to Intensity Cumulative Diameter Pipe Slope Capacity Percent <br /> Drain ID Structure Structure invert invert Length Area(A)sf (C) C*A Structure in/hr Runoff Runoff cfs (in) (%) cfs Capacity Check <br /> SDI CBI. CB2 79.16 78.8 28 4710 0.90 0.10 5 3.07 _ 0.30 0.30 12 1.3% 5.25 6% OK <br /> SD2 CB2 CB3 78.8 76.7 108 10880 0.35 0.09 5 3.07 0.27 0.57 12 1.9% 6.46 9% OK <br /> SD3 CB4 CB3 77.06 76.7 13 17350 0.90 0.36 5 3.07 1.10 1.10 12 2.8% 7.71 14% OK <br /> SD4 CB3 Pond 76.7 76 23 0 0.90 0.00 5 3.07 0.00 1.67 12 3.0% 8.08 21% OK <br /> SD5 CBS Pond 77.16 76 35 10160 0.90 0.21 5 3.07 0.64 0.64 12 3.3% 8.43 8% OK <br /> SD6 CB6 CB7 82.72 77.37 152 7900 0.90 0.16 5 3.07 0.50 0.50 12 3.5% 8.69 6% OK <br /> SD7 CB7 Pond 77.37 76 12 8780 0.90 0.18 5 3.07 0.56 1.06 12 11.4% 15.65 7% OK <br />