Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> Contents <br /> 1.0 Introduction 1 <br /> 2.0 Site Description 3 <br /> 2.1 Existing Conditions 3 <br /> 2.2 Proposed Construction Activities 3 <br /> 3.0 Construction Stormwater BMPs 5 <br /> 3.1 The 12 BMP Elements 5 <br /> 3.1.1 Element#1 —Mark Clearing Limits 5 <br /> 3.1.2 Element#2—Establish Construction Access 5 <br /> 3.1.3 Element#3 —Control Flow Rates 6 <br /> 3.1.4 Element#4—Install Sediment Controls 6 <br /> 3.1.5 Element#5 —Stabilize Soils 8 <br /> 3.1.6 Element#6—Protect Slopes 8 <br /> 3.1.7 Element#7—Protect Drain Inlets 9 <br /> 3.1.8 Element#8—Stabilize Channels and Outlets 9 <br /> 3.1.9 Element#9—Control Pollutants 10 <br /> 3.1.10 Element#10—Control Dewatering 11 <br /> 3.1.11 Element#11 —Maintain BMPs 12 <br /> 3.1.12 Element#12—Manage the Project 12 <br /> 4.0 Construction Phasing and BMP Implementation 14 <br /> 5.0 Pollution Prevention Team 16 <br /> 5.1 Roles and Responsibilities 16 <br /> 5.2 Team Members 16 <br /> 6.0 Site Inspections and Monitoring 17 <br /> 6.1 Site Inspection 17 <br /> 6.1.1 Site Inspection Frequency 17 <br /> 6.1.2 Site Inspection Documentation 17 <br /> 6.2 Stormwater Quality Monitoring 18 <br /> 6.2.1 Turbidity Sampling 18 <br /> 7.0 Reporting and Recordkeeping 21 <br /> 7.1 Recordkeeping 21 <br /> 7.1.1 Site Log Book 21 <br /> 7.1.2 Records Retention 21 <br /> 7.1.3 Access to Plans and Records 21 <br /> 7.1.4 Updating the SWPPP 21 <br /> Appendix A—TESC Plans 23 <br /> Appendix B—Construction BMPs 25 <br />