Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> • Section 2—SITE DESCRIPTION. This section provides a detailed description of the <br /> existing site conditions, proposed construction activities, and calculated stormwater <br /> flow rates for existing and post-construction conditions. <br /> • Section 3 —CONSTRUCTION BMPs. This section provides a detailed description of <br /> the BMPs to be implemented based on the 12 required elements of the SWPPP <br /> (SWMMWW 2005). <br /> • Section 4—CONSTRUCTION PHASING AND BMP IMPLEMENTATION. This <br /> section provides a description of the timing of the BMP implementation in relation to <br /> the project schedule. <br /> • Section 5 —POLLUTION PREVENTION TEAM. This section identifies the <br /> appropriate contact names (emergency and non-emergency), monitoring personnel, <br /> and the onsite temporary erosion and sedimentation control inspector. <br /> • Section 6—INSPECTION AND MONITORING. This section provides a description <br /> of the inspection and monitoring requirements such as the parameters of concern to <br /> be monitored, sample locations, sample frequencies, and sampling methods for all <br /> stormwater discharge locations from the site. <br /> • Section 7—RECORDKEEPING. This section describes the requirements for <br /> documentation of the BMP implementation, site inspections, monitoring results, and <br /> changes to the implementation of certain BMPs due to site factors experienced during <br /> construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> 111 <br /> Appendix A — Site Plans <br /> Appendix B —Construction BMPs <br /> Appendix C —Alternative Construction BMP list <br /> Appendix D —General Permit <br /> Appendix E —Site Log and Inspection Forms <br /> Appendix F —Engineering Calculations <br /> I <br /> I <br /> 2 <br /> 1 <br />