Soormwater Pollution Prevention Plan <br /> Percent impervious area after construction: 74 % <br /> Disturbed area during construction: 2.01 acres <br /> Disturbed area that is characterized as impervious (i.e., <br /> access roads, staging, parking): 1.49 acres <br /> 2-year stormwater runoff peak flow during construction: 0.77 cfs <br /> 10-year stormwater runoff peak flow during construction: 1.16 cfs <br /> All stormwater flow calculations are provided in Appendix F. <br /> I <br /> 4 <br />