My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
>
Address Records
>
N BROADWAY
>
819
>
WASHINGTON STATE UNIVERSITY
>
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 11:08:12 AM
Creation date
4/3/2018 2:53:01 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
819
Tenant Name
WASHINGTON STATE UNIVERSITY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> Alternate channel and outlet stabilization BMPs are included in Appendix C as a quick reference <br /> tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or <br /> inappropriate during construction to satisfy the requirements set forth in the General NPDES <br /> Permit(Appendix D). To avoid potential erosion and sediment control issues that may cause a <br /> violation(s) of the NPDES Construction Stormwater permit(as provided in Appendix D),the <br /> Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or <br /> more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are <br /> ineffective or failing. <br /> The project site is located west of the Cascade Mountain Crest. As such, all temporary onsite <br /> conveyance channels shall be designed, constructed, and stabilized to prevent erosion from the <br /> expected peak 10 minute velocity of flow from a Type 1A, 10-year, 24-hour recurrence <br /> interval storm for the developed condition. Alternatively, the 10-year, 1-hour peak flow rate <br /> indicated by an approved continuous runoff simulation model, increased by a factor of 1.6, shall <br /> be used. Stabilization, including armoring material, adequate to prevent erosion of outlets, <br /> adjacent streambanks, slopes, and downstream reaches shall be provided at the outlets of all <br /> conveyance systems. <br /> 3.1.9 Element#9—Control Pollutants <br /> All pollutants, including waste materials and demolition debris, that occur onsite shall be <br /> handled and disposed of in a manner that does not cause contamination of stormwater. Good <br /> housekeeping and preventative measures will be taken to ensure that the site will be kept clean, <br /> well organized, and free of debris. If required, BMPs to be implemented to control specific <br /> sources of pollutants are discussed below. <br /> Vehicles, construction equipment, and/or petroleum product storage/dispensing: <br /> • All vehicles, equipment, and petroleum product storage/dispensing areas will be <br /> inspected regularly to detect any leaks or spills, and to identify maintenance needs to <br /> prevent leaks or spills. <br /> • Onsite fueling tanks and petroleum product storage containers shall include secondary <br /> containment. <br /> • Spill prevention measures, such as drip pans, will be used when conducting maintenance <br /> and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site,temporary plastic will be placed beneath <br /> and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any discharge or spill <br /> incident. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.