My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
>
Address Records
>
N BROADWAY
>
819
>
WASHINGTON STATE UNIVERSITY
>
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 11:08:12 AM
Creation date
4/3/2018 2:53:01 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
819
Tenant Name
WASHINGTON STATE UNIVERSITY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4.10 <br /> Geotextile Standards <br /> Polymeric Mesh AOS 0.60 mm maximum for slit film wovens(#30 sieve). 0.30 <br /> (ASTM D4751) mm maximum for all other geotextile types(#50 sieve). <br /> 0.15 mm minimum for all fabric types(#100 sieve). <br /> Water Permittivity 0.02 sec1 minimum <br /> (ASTM D4491) <br /> Grab Tensile Strength 180 lbs.Minimum for extra strength fabric. <br /> (ASTM D4632) 100 lbs minimum for standard strength fabric. <br /> Grab Tensile Strength 30%maximum <br /> (ASTM D4632) <br /> Ultraviolet Resistance 70%minimum <br /> (ASTM D4355) <br /> • Standard strength fabrics shall be supported with wire mesh, chicken <br /> wire, 2-inch x 2-inch wire, safety fence, or jute mesh to increase the <br /> strength of the fabric. Silt fence materials are available that have <br /> synthetic mesh backing attached. <br /> • Filter fabric material shall contain ultraviolet ray inhibitors and <br /> stabilizers to provide a minimum of six months of expected usable <br /> construction life at a temperature range of 0°F. to 120°F. <br /> • 100 percent biodegradable silt fence is available that is strong, long <br /> lasting, and can be left in place after the project is completed, if <br /> permitted by local regulations. <br /> • Standard Notes for construction plans and specifications follow. Refer <br /> to Figure 4.19 for standard silt fence details. <br /> The contractor shall install and maintain temporary silt fences at the <br /> locations shown in the Plans. The silt fences shall be constructed in <br /> the areas of clearing, grading, or drainage prior to starting those <br /> activities. A silt fence shall not be considered temporary if the silt <br /> fence must function beyond the life of the contract. The silt fence <br /> shall prevent soil carried by runoff water from going beneath, through, <br /> or over the top of the silt fence, but shall allow the water to pass <br /> through the fence. <br /> The minimum height of the top of silt fence shall be 2 feet and the <br /> maximum height shall be 2'/2 feet above the original ground surface. <br /> The geotextile shall be sewn together at the point of manufacture, or at <br /> an approved location as determined by the Engineer, to form geotextile <br /> lengths as required. All sewn seams shall be located at a support post. <br /> Alternatively,two sections of silt fence can be overlapped,provided <br /> the Contractor can demonstrate, to the satisfaction of the Engineer, that <br /> the overlap is long enough and that the adjacent fence sections are <br /> close enough together to prevent silt laden water from escaping <br /> through the fence at the overlap. <br /> February 2005 Volume ll— Construction Stormwater Pollution Prevention 4-95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.