My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
>
Address Records
>
N BROADWAY
>
819
>
WASHINGTON STATE UNIVERSITY
>
819 N BROADWAY WASHINGTON STATE UNIVERSITY 2018-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 11:08:12 AM
Creation date
4/3/2018 2:53:01 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
819
Tenant Name
WASHINGTON STATE UNIVERSITY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Either a permanent control structure or the temporary control structure <br /> (described in BMP C241, Temporary Sediment Pond) can be used. If a <br /> permanent control structure is used, it may be advisable to partially restrict <br /> the lower orifice with gravel to increase residence time while still allowing <br /> dewatering of the pond. A shut-off valve may be added to the control <br /> structure to allow complete retention of stormwater in emergency <br /> situations. In this case, an emergency overflow weir must be added. <br /> A skimmer may be used for the sediment trap outlet if approved by the <br /> Local Permitting Authority. <br /> Design and • See Figures 4.22 and 4.23 for details. <br /> Installation • If permanent runoff control facilities are part of the project, they <br /> Specifications <br /> should be used for sediment retention. <br /> • To determine the sediment trap geometry, first calculate the design <br /> surface area(SA) of the trap, measured at the invert of the weir. Use <br /> the following equation: <br /> SA = FS(Q2/Vs) <br /> where <br /> Q2 = Design inflow based on the peak discharge from the <br /> developed 2-year runoff event from the contributing <br /> drainage area as computed in the hydrologic analysis. The <br /> 10-year peak flow shall be used if the project size, expected <br /> timing and duration of construction, or downstream <br /> conditions warrant a higher level of protection. If no <br /> hydrologic analysis is required, the Rational Method may <br /> be used. <br /> Vs = The settling velocity of the soil particle of interest. The <br /> 0.02 mm(medium silt)particle with an assumed density of <br /> 2.65 g/cm3 has been selected as the particle of interest and <br /> has a settling velocity (Vs) of 0.00096 ft/sec. <br /> FS = A safety factor of 2 to account for non-ideal settling. <br /> Therefore,the equation for computing surface area becomes: <br /> SA = 2 x Q2/0.00096 or <br /> 2080 square feet per cfs of inflow <br /> Note: Even if permanent facilities are used, they must still have a <br /> surface area that is at least as large as that derived from the above <br /> formula. If they do not, the pond must be enlarged. <br /> • To aid in determining sediment depth, all sediment traps shall have a <br /> staff gauge with a prominent mark 1-foot above the bottom of the trap. <br /> February 2005 Volume ll— Construction Stormwater Pollution Prevention 4-103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.