Laserfiche WebLink
Ifr INSPECTION REPORT <br /> ovi�_ Date 0 v1 Lf Permit: f 70 3 -- O/i) <br /> Contractor: <br /> Owner: <br /> Site Address: 2 2 c ! i/2. 71 c il &7 <br /> Rei2, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ugh In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing Li Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑GasPipe Final <br /> ❑HWT Final <br /> OTHE OR CONSULTATION: ��-�j� �`l P/"( __ <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> • OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> i< j._. r /1)) .--1 _4- <br /> xo 7A L,1 , <br /> 7a L.-e z.4 C ie S oi( 5c 4c <br /> 0.-ACA 6 t) <br /> ls - x0�� - 11- <br /> F' Alegi i /L I P -- <br /> ,c,/- F r, <br /> Inspector: Cp Date: 0 -- /9"-'% '1 L <br /> EIR(10/06) D ABAR,INC. <br />