Laserfiche WebLink
I <br /> Downstream Analysis: <br /> Storm water run-off that discharges from the site as surface water will do so along the <br /> east property line and sheet flow for approximately 150 ft and discharging into Pigeon <br /> Creek #2. Surface water will be conveyed to the north more than 0.25 miles. The <br /> proposed project will not have an adverse impact to downstream properties or Pigeon <br /> Creek#2. <br /> COMPLIANCE WITH APPLICABLE MINIMUM REQUIREMENTS <br /> Based on SMMWW, Volume I, Figure 2.4.1 (Figure 6: Minimum Requirements) this proposed <br /> new development project will comply with Minimum Requirements#1 through#9. The purpose <br /> of the requirements is to prevent and control adverse impacts of the drainage and stormwater on <br /> the public health, safety and general welfare. To meet these requirements, a Construction Storm <br /> Water Pollution Prevention Plan (SWPPP) has been provided. The following addresses <br /> Minimum Requirements 1 to 9: <br /> Minimum Requirement#1: Preparation of stormwater site plan <br /> A Stormwater Site Plan/Building Site Plan has been prepared. <br /> Minimum Requirement#2: Stormwater Pollution Prevention Plans (SWPPP) <br /> SWPPP drawings and the required elements have been prepared and are a stand-alone <br /> document from this report. The BMP's indicated on the plans will be implemented during <br /> construction. Additional BMP's may be used on the site depending upon weather <br /> conditions. <br /> Minimum Requirement#3: Source Control of Pollution <br /> During construction SWPPP BMP's will be implemented, based on Volume IV, Chapter <br /> 5, as shown on the SWPP plans. This project is not required to have source control <br /> BMP's after construction is completed. <br /> Minimum Requirement#4: Preservation of natural drainage and outfalls <br /> The proposed site development is not expected to have off-site drainage impacts. This <br /> project will disperse storm water run-off from the natural drainage location. On-site <br /> BMPs will be used to mitigate potential erosion issues and control run-off. For more <br /> information about BMP details and placement please refer to Section I of this report and <br /> Site Plans associated with this project. <br /> Minimum Requirement#5: On-site Stormwater Management <br /> The proposed project triggers Minimum Requirements 1 through 9, the site is located <br /> inside the Urban Growth Area (UGA) and is less than 5.0 acres; therefore, the proposed <br /> 4 <br />