My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
225 N CABOT RD 2019-10-04
>
Address Records
>
N CABOT RD
>
225
>
225 N CABOT RD 2019-10-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 11:22:01 AM
Creation date
4/4/2018 3:07:55 PM
Metadata
Fields
Template:
Address Document
Street Name
N CABOT RD
Street Number
225
Notes
"Unit B" is 6832 Beverly Ln, "Unit A" is this address
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Downstream Analysis: <br /> Storm water run-off that discharges from the site as surface water will do so along the <br /> east property line and sheet flow for approximately 150 ft and discharging into Pigeon <br /> Creek #2. Surface water will be conveyed to the north more than 0.25 miles. The <br /> proposed project will not have an adverse impact to downstream properties or Pigeon <br /> Creek#2. <br /> COMPLIANCE WITH APPLICABLE MINIMUM REQUIREMENTS <br /> Based on SMMWW, Volume I, Figure 2.4.1 (Figure 6: Minimum Requirements) this proposed <br /> new development project will comply with Minimum Requirements#1 through#9. The purpose <br /> of the requirements is to prevent and control adverse impacts of the drainage and stormwater on <br /> the public health, safety and general welfare. To meet these requirements, a Construction Storm <br /> Water Pollution Prevention Plan (SWPPP) has been provided. The following addresses <br /> Minimum Requirements 1 to 9: <br /> Minimum Requirement#1: Preparation of stormwater site plan <br /> A Stormwater Site Plan/Building Site Plan has been prepared. <br /> Minimum Requirement#2: Stormwater Pollution Prevention Plans (SWPPP) <br /> SWPPP drawings and the required elements have been prepared and are a stand-alone <br /> document from this report. The BMP's indicated on the plans will be implemented during <br /> construction. Additional BMP's may be used on the site depending upon weather <br /> conditions. <br /> Minimum Requirement#3: Source Control of Pollution <br /> During construction SWPPP BMP's will be implemented, based on Volume IV, Chapter <br /> 5, as shown on the SWPP plans. This project is not required to have source control <br /> BMP's after construction is completed. <br /> Minimum Requirement#4: Preservation of natural drainage and outfalls <br /> The proposed site development is not expected to have off-site drainage impacts. This <br /> project will disperse storm water run-off from the natural drainage location. On-site <br /> BMPs will be used to mitigate potential erosion issues and control run-off. For more <br /> information about BMP details and placement please refer to Section I of this report and <br /> Site Plans associated with this project. <br /> Minimum Requirement#5: On-site Stormwater Management <br /> The proposed project triggers Minimum Requirements 1 through 9, the site is located <br /> inside the Urban Growth Area (UGA) and is less than 5.0 acres; therefore, the proposed <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.