Laserfiche WebLink
10-CONTROL DEWATERING <br /> For the proposed building, dewatering is not expected to be required; thus, dewatering <br /> control will not be required for this project. <br /> Best Management Practices (BMPs)to be used: <br /> • None Required <br /> 11-MAINTAIN BEST MAINAGEMENT PRACTICES <br /> BMPs will be inspected and maintained after storms and during construction. <br /> 12-MANAGE THE PROJECT <br /> This SWPPP will be implemented at all times and will be modified whenever there is a <br /> significant change to the site conditions. The Erosion control BMPs will be implemented <br /> in the following sequence: <br /> 1. Mark the clearing limits. <br /> 2. Establish staging areas for storage and handling polluted materials and BMPs. <br /> 3. Install sediment control BMPs. <br /> 4. Hand grade and install stabilization measure for disturbed areas <br /> 5. Maintain BMPs until final site stabilization, at which time they may be removed. <br /> 13-PROTECT ON-SITE STORMWATER BMPS <br /> On-site storm water BMPs, existing and proposed, will be protected at all times from <br /> siltation and compaction during construction. The approved plans have both construction <br /> sequencing and appropriate SWPPP BMPs to minimize the risk to storm water BMPs. <br /> Best Management Practices (BMPs)to be used: <br /> • BMP C103: High Visibility Fence <br />