Laserfiche WebLink
INSPECTION REPORT <br /> /11•://'"'""Ir.. <br /> Date l k Permit: c��i 2.,"0 L/ 1 <br /> �:� <br /> 1 <br /> Contractor: 0031(1\e-3V-1 <br /> t`2— Owner: C <br /> Site Address: 1 -14 I �ka� <br /> dfOr <br /> TYPE OF INSPE TION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> Slop- -.•nduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ENI-.ugh I ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> [l,Sawice ❑Framing ❑Rooftop Units ❑Water Service <br /> ■ •. ding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> • 'ER OR ceNSULTATION: <br /> OVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR '.•. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice„required <br /> Ot - 4C"-"4 <br /> OK. c5-gute--t. <br /> C Pu 6 <br /> Inspector. Date: I 3 (7 <br /> EIR(10/06) DATABAR,INC. <br />