My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2433 W MUKILTEO BLVD 2018-04-05
>
Address Records
>
W MUKILTEO BLVD
>
2433
>
2433 W MUKILTEO BLVD 2018-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 8:48:00 AM
Creation date
4/5/2018 8:47:52 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
2433
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Site Information: <br /> 1. How will your project change the existing conditions? <br /> Click here to enter text. <br /> 2. Please provide the following quantities of proposed hard surfaces in square feet: <br /> Proposed Roof Area: Click here to enter text. <br /> Proposed Other Hard Surfaces(pavement,gravel,etc.): Click here to enter text. <br /> 3. How will you manage rooftop runoff after the project is completed? <br /> Through a downspout system with draintile to the grass area <br /> 4. How will you manage stormwater runoff from hard surfaces(driveways, paved pathways, <br /> patios,etc.)?Evaluate each type of hard surface separately. <br /> Flow sheeting from driveway to street. Roof runoff into the down spouts then into the <br /> drain pipes to grass <br /> Plan for Permanent On-Site Stormwater Management: <br /> You are required to "infiltrate, retain,and disperse stormwater"on your site to the maximum extent <br /> you can without causing erosion or flooding.The goal is to get stormwater runoff in contact with <br /> vegetated surfaces as much as possible before discharging to downstream conveyance systems. <br /> See Volume III, Chapter 12 of the 2010 Stormwater Management Manual for stormwater facility <br /> requirements: https://everettwa.gov/DocumentCenter/Home/View/1214 <br /> 1. Determine which options you must use for managing stormwater from rooftops via downspout <br /> disconnect by considering the following Best Management Practices(BMPs) in order: <br /> • BMP 12.30 On-site Infiltration Areas <br /> • BMP 12.40 Raingardens <br /> • BMP 12.50 Downspout Dispersion <br /> Notes: <br /> a. If location criteria can be met, but sizing criteria cannot,you must implement the BMPs to <br /> the maximum extent you can without causing erosion or flooding. Pre-sized facilities have <br /> been designed to meet 100%mitigation. Facilities may be able to be installed to achieve <br /> some stormwater mitigation. <br /> b. Other innovative downspout control BMPs such as rain barrels, ornamental ponds, <br /> downspout cisterns, dry wells,or other downspout water storage devices may also be used <br /> with prior approval by the City of Everett.These are options to consider after the above <br /> listed BMPs are evaluated. <br /> 2. Determine which options you must use for managing stormwater from hard surfaces(driveways, <br /> paved pathways,etc.) by considering the following for each type of hard surface proposed: <br /> • BMP 12.60 Concentrated Flow Dispersion <br /> • BMP 12.70 Sheet Flow Dispersion <br /> Note: Propose an alternative stormwater management plan if none of the above BMPs can feasibly be <br /> installed. (Examples:Shallow vegetated swale,perforated pipe stub-out, etc.) <br /> Provide your Evaluation below and Show where these will take place on a site map: <br /> Click here to enter text. <br /> Page 3 of, <br /> CITY OF EVERE! I 3200 Ceci it Street I Everett,WA 98201 425-257-8810 !everettv,,rv.�: <br />
The URL can be used to link to this page
Your browser does not support the video tag.