My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3317 RUCKER AVE C D 2020-07-15
>
Address Records
>
RUCKER AVE
>
3317
>
3317 RUCKER AVE C D 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 2:17:51 PM
Creation date
4/5/2018 9:25:53 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3317
Unit
C D
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1111 <br /> CRHPage 1 of 1 <br /> ENGINEERING <br /> February 26,2018 <br /> Mr.Brad Rzechula � '� , <br /> Leading Edge Construction LLC �"�m; �®� !,�o <br /> 1777 S.Burlington Blvd.#513 <br /> Burlington,WA 98233 3 <br /> ;44E17 <br /> RE: 3317 Rucker Ave.LLC t 46364 ,A <br /> City of Everett Plan Check No:B1712-005 <br /> February 23,2018 Review Comments Email ONS, <br /> - ZG <br /> Mr.Rzechula, <br /> Below you will find responses to the City of Everett Building Permit Review email dated February 23,2018 <br /> for the above referenced project. Please note,the below responses are only for the portion of the letter <br /> identified as"Structural". <br /> Item 2:Beam calculations including the use of the Overstrength Factor(S2)on seismic loads required by <br /> ASCE 7-10 Sec 12.3.3.3 are attached. It was overlooked that this information was not provided in the prior <br /> response. <br /> Item 4: Column calculations provided include the use of the Overstrength Factor(S2)on seismic loads required <br /> by ASCE 7-10 Sec 12.3.3.are attached. It was overlooked that this information was not provided in the prior <br /> response. <br /> Item 5: Spread footing calculations provided include the use of the Overstrength Factor(SZ)on seismic loads <br /> required by ASCE 7-10 Sec 12.3.3..are attached. It was overlooked that this information was not provided in <br /> the prior response. <br /> Item 6:Connection designs of affected elements indicated in Items 2, 3,and 5 also require the use of the S2 per <br /> ASCE 7-10 Sec 12.3.3.3 are attached. It was overlooked that this information was not provided in the prior <br /> response. <br /> Item 9:Please coordinate submittal of the joist engineers requested data as outlined in the building <br /> department's request. <br /> As always, should you or the building department need any further information feel free to let me know. <br /> Sincerely, I <br /> 11RID C OVE <br /> Cody R.Hart,P.E. .-. <br /> FEB 2 6 2018 <br /> CITY OF EVERETT <br /> cc: File Permit Services <br /> 817 Metcalf Street, Suite 207 Office: 360.855.2333 Ext. 207 <br /> Sedro-Woolley, WA 98284 Cell: 360.982.0928 <br />
The URL can be used to link to this page
Your browser does not support the video tag.