Laserfiche WebLink
cC \ )00D ? C..A C <br /> Envelope Summary ENV-SUM <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> Project Info Project Title: OLYMPIC PARK APARTMENTS-LEASE OFFICE Date 06/29/2016 <br /> Applicant Information. Provide contact information for individual who can For Building Department Use <br /> ot <br /> Compliance forms <br /> Co npl require a respond to inquiries about compliance form information provided. <br /> password to use. Company Name: Skotdal Real Estate <br /> Instructional and <br /> calcculatingngcells are Company Address: 2707 Colby,Suite 1200,Everett,WA 98201 <br /> write-protected. Applicant Name: A.Gary O'Leary,RA <br /> Applicant Phone: (425)252-5400 <br /> Applicant Email: gary.oleary@skotdal.com <br /> Project Description ❑I New Building ❑Addition ❑Alteration <br /> Occupancy Type 0 All Commercial 0 Group R-All R1 and R2,R3,R4 over 3 stories 0 <br /> Selection required to enable forms. <br /> Envelope Compliance Path <br /> 0 Prescriptive 0 Component Performance <br /> Selection required to enable forms. <br /> Component Performance <br /> 0 Standard 0 Change of Occupancy/Conditioning 0 <br /> Calculation Type <br /> Selection required to enable ENV-UA ❑Additional Efficiency Package Option-C406.8 Enhanced Envelope <br /> and ENV-SHGC forms. To comply,demonstrate building thermal envelope performance is 15%lower than the Target UA. <br /> ❑ Air barrier testing per Section C402.5.1.2 D Air barrier testing not required <br /> included in project scope <br /> Air Barrier Testing ❑ Additional Efficiency Package Option-C406.9 Reduced Air Infiltration <br /> To comply,demonstrate that measured air leakage of building envelope does not exceed 0.25 <br /> cfm/ft2(air barrier surface area)under test pressure of 0.3 inch w.g. <br /> Vertical Fenestration and Total Vertical Gross Exterior <br /> Skylight Area Calculation Fenestration Above Grade %Vertical <br /> (rough opening) divided by Wall Area times 100 equals Fenestration <br /> Prescriptive Path-Enter values for <br /> vertical fenestration,skylights,gross walls 617.8 — 2375. 9 X 100 = 26.0$ <br /> and roof on this ENV-SUM worksheet. • <br /> Component Performance-Enter values Gross Exterior <br /> in ENV-UA and/or ENV-UA-GROUP-R Total Skylight divided by Roof Area times 100 equals %Skylight <br /> worksheet. These values auto-fill from <br /> ENV-UA and are write-protected on ENV- 0.0 _• <br /> 1835.0 X 100 = 0.0% <br /> Vertical <br /> Fenestration VERTICAL FENESTRATION AREA COMPLIES <br /> Fenestration Area Compliance Area <br /> Skylight Area SKYLIGHT AREA COMPLIES <br /> Vertical Fenestration 0 High performance fenestration U-factors and SHGC per C402.4.1.3 <br /> Alternates 0 Dedicated outdoor air system per C402.4.1.4 and C403.6 <br /> Show locations of qualifying daylight zone Q In buildings>_3 stories,25%or more of NET floor area is in daylight zones per <br /> areas and ft2 on project plans. <br /> Q In buildings<3 stories,50%or more of CONDITIONED floor area is within daylight zones per <br /> For Daylight Zone Area Calculations- C402.4.1.1 <br /> a)Sidelight areas include primary+ Daylight Zone Calculations <br /> secondary daylght zone areas. Daylight Zone Fenestration Alternate Sidelight Daylight Toplight Daylight Percent Daylight <br /> b)Include overlapping toplight and Not Selected.No Calculations Required Zone Area Zone Area Zone Area <br /> sidelight daylight zone areas under <br /> Toplight. <br /> c)Refer to Chapter 2 for net floor area <br /> Spaces in Single Story List all enclosed spaces that exceed 2,500 ft2,have ceiling height greater than 15 ft,and are space <br /> Building Requiring Skylights types required to comply with this provision. <br /> Code requires a minimum of 50%of the floor Space Area(ft2) DLZ Area(ft2) SRR or Aperature Exception <br /> area to be within a skylight daylight zone for <br /> specific space types.Refer to C402.4.2 for <br /> requirements. <br /> DLZ=Daylight zone, 9 <br /> SRR=Skylight to roof ratio Indicate aperature with"AP"prefix(AP 1.1%) I / 3 <br />