Laserfiche WebLink
• <br /> b. Guarantee funds will not be released by the Citi "unlues <br /> approval has been received from all applicable departments <br /> • that are responsible for acceptance and/or maintenance of <br /> such improvements. <br /> c. All improvements begun by the applicant must be completed. <br /> Once the applicant has begun making improvements, the <br /> applicant shall not be eligible for submitting a guarantee <br /> to the City to cover the incomplete improvements unless <br /> specifically approved by the City - Engineer and/or City <br /> Council in accordance with final approval of the <br /> subdivision or short subdivision. If approved, the amount <br /> of the guarantee may exceed the limits noted in Section 5 D <br /> 1 a to offset additional City exposure. <br /> 2. Warranty Requirements for Acceptance of Final Improvements <br /> a. At the time of final acceptance of the improvements, the <br /> applicant shall provide to the City a one year warranty <br /> guarantee at 10% of the established final cost of the <br /> improvements which must be acceptable to the City Attorney. <br /> b. For the purpose of this Ordinance, final approval shall not <br /> be deemed given until such time as all of the required <br /> improvements have been satisfactorily installed in <br /> accordance with the requirements of preliminary approval. <br /> E. Improvements <br /> 1 . Smooth Transition of Improvements: <br /> All improvements required by this Ordinance shall be extended as <br /> necessary to provide a smooth transition with existing <br /> improvements, both laterally across the street and longitudinally <br /> up and down the street, for utilities, vehicular and pedestrian <br /> traffic. <br /> 2. Utility Improvement Plans: <br /> All street and utility improvement plans shall be prepared by a <br /> State of Washington Licensed Civil Engineer. All plans shall be <br /> prepared on reproducible mylar material and presented to the City <br /> for approval. <br /> 3. Acceptance of Improvements: <br /> The City Engineer is hereby authorized to accept all improvements <br /> and/or right-of-way dedication required in this Ordinance on <br /> behalf of the City. <br /> F. Survey <br /> 1 . Survey Required for All Divisions and Redivisions of Land: <br /> a. A survey for division and redivision must be conducted by <br /> or under the supervision of a registered land surveyor in <br /> the State of Washington. The surveyor shall certify on the <br /> plat or short plat that it is true and correct <br /> representation of the lands actually surveyed and the <br /> survey was done in accordance with City and State law. <br /> b. In all subdivisions and short subdivisions, lot corner <br /> monuments must be set before final approval can be granted. <br /> -31- <br />