My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1119-85
>
Ordinances
>
Ordinance 1119-85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 10:48:18 AM
Creation date
4/5/2018 10:15:25 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1198-85
Date
3/29/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> c. In all SLbdivisions and short subdivisions, perimeter <br /> monuments must be set before final approval can be granted. <br /> d. In all subdivisions and short subdivisions, control <br /> monuments must be set before final acceptance of public <br /> improvements. Performance guarantees must include the <br /> installation of all control monuments. Control monuments <br /> must be installed per City Design and Construction <br /> Standards. <br /> e• In all subdivisions and short subdivisions where final <br /> approval is to be granted by the acceptance of a <br /> performance guarantee, lot corner and perimeter monuments <br /> must be set. The performance guarantee must include the <br /> resetting of any monument that has been lost during - <br /> construction of public improvements. <br /> G. Dedication <br /> Any dedication, donation or grant as shown on a short plat or plat map <br /> shall be constitute a statutory warranty deed to the said grantee for <br /> the use intended. <br /> • <br /> • <br /> -32- <br />
The URL can be used to link to this page
Your browser does not support the video tag.