My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 80TH ST SW JAMCO AMERICA 2019-09-16
>
Address Records
>
80TH ST SW
>
1122
>
JAMCO AMERICA
>
1122 80TH ST SW JAMCO AMERICA 2019-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 2:34:56 PM
Creation date
4/5/2018 10:57:40 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1122
Tenant Name
JAMCO AMERICA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sentvia e-mats i <br /> • PUBLIC WOIRKS <br /> 1 2 0 fto <br /> May 17, 2016 <br /> Mr. Jesse Chutich <br /> Comfort Mechanical <br /> 3202 C St NE <br /> Auburn, WA 98002 <br /> Owner: Jamco <br /> Job Address: 1122 80th St SW <br /> Plan Check No: M1605-038 <br /> RE: Corrections Letter <br /> Dear Mr. Chutich, <br /> In response to the application for a mechanical permit, the plans have been examined and you <br /> are advised that revisions may be necessary before a permit can be issued. Please review and <br /> respond to the comments below. Codes cited refer to the 2012 International Building Code <br /> (IBC), the 2012 International Fire Code (IFC), the 2012 International Mechanical Code (IMC), <br /> and the 2012 Washington State Energy Code (WSEC), as amended by the State of Washington <br /> and adopted by the City of Everett. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two revised sheets of construction documents <br /> reflecting the corrections requested. Please bubble and date revisions to the <br /> previously submitted sheets, with written instructions on what drawings to <br /> replace/add. Revisions can be e-mailed to my attention. <br /> 1. The weight of the exhaust fan should be shown on the schedule. <br /> 2. Economizers should be shown on new cooling unit on the equipment schedule, per <br /> WSEC C403.3.1. Fixed open louvers do not meet the requirements of the WSEC for <br /> conditioned air. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. All required submittals shall be of sufficient detail and contain sufficient <br /> information to ensure that the proposed structure will be constructed in compliance with all <br /> adopted codes. <br /> cer- . _:.�___- _ _ <br /> (-\\Z <br /> eg Haley, <br /> Plan ReVie rchitect mhaley@everettwa.gov <br /> CITY OF E RETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax(425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.