Laserfiche WebLink
PUBLIC WORKS <br /> ^ ENGINEERING /PUBLIC SERVICES DEPARTMENT <br /> January 15, 2016 <br /> Kevin Smith <br /> ksmithOsmithco.orq <br /> RE: Owner: Jamco America <br /> Job Address: 1122 80th St SW <br /> Plan Check No: B1601-001 <br /> Dear Mr. Smith, <br /> In response to your application for a construction permit, your plans have been examined and you are <br /> advised that revisions may be necessary before a permit can be issued. Please review and respond to the <br /> comments below.These comments address building issues only. Additional revisions or additions may be <br /> required by other departments(such as Utilities, Planning or Fire). All references refer to the 2012 <br /> International Building Code (IBC), the 2012 International Fire Code (IFC), the 2012 International <br /> Mechanical Code (IMC), and the 2012 International Energy Conservation (IECC), as amended by the <br /> State of Washington and adopted by the city of Everett.The current IBC referenced standard for <br /> accessible design is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal <br /> ADA, FHA, and HUD regulations and standards, including the Fair Housing Accessibility Guidelines may be <br /> more restrictive. <br /> In order for the processing of your application to continue,it will be necessary to provide the <br /> Building Division with two complete new sets of construction documents reflecting the <br /> corrections requested. <br /> 1. IBC 1009.7.2 requires a minimum stair tread depth of 11 in.This measurement is"between the <br /> vertical planes of the foremost projection of adjacent treads and at a right angle to the tread's <br /> nosing". Please revise detail 4/A2.0. <br /> 2. IBC 1012.6 requires handrail extensions. The top extension shall extend horizontally at least 12 <br /> in. beyond the top riser. The bottom extension shall continue to slope for the depth of one tread <br /> beyond the bottom riser. <br /> 3. IBC 106.1 requires the mezzanine live load (100psf)to be posted by a conspicuous and durable <br /> sign. Please include this requirement. <br /> 4. Provide connection details for the mezzanine framing members. <br /> If you have any questions, please call me at 425-257-7264. <br /> Please prepare a response letter showing where each item in this correction letter is addressed on the <br /> plan set. <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, e L,,, 1P,Al2----- <br /> ` <br /> .... 1/4, <br /> CITY OF EVERETT•3200 Cedar Street• Everett, WA 98201 • (425) 257-8200 • Fax (425) 257-8856 i <br />