Laserfiche WebLink
• <br /> 4. Uncrating 5. Instructions for Reversing Air <br /> The furnace is shipped completely assembled.Immediately upon un- Flow (Changing Directional Air <br /> crating,check the gas specifications and electrical characteristics of the <br /> unit to be sure that they agree with the gas and electric supply at the Baffles) - Applies only to Duct <br /> ' installation site. Furnace Models SC and HSC <br /> Check the unit for any damage that may have been incurred during <br /> shipment.If damage is found,file a claim with the transporting agency. All furnaces are equipped with directional air baffles in the heat ex- <br /> This unit was operated and inspected at the factory immediately prior changer area.Facing the control compartment of the furnace,the stan- <br /> to crating and was in operating condition at that time. dard direction of air flow is from left to right.If the installation requires <br /> The bottom corners are fastened to the crate with angle clips.Remove air flow from right to left(when facing the control compartment),the <br /> the lag screws from the shipping clips.Remove the clips and return the position of the directional air baffles may be reversed.Refer to Figure <br /> bolts to the heater leg to support the corner leg and heater bottom. 4A for an SC model or Figure 4B for an HSC Model and follow the <br /> Putting the bolts back in the heater is required for proper opera- instructions to reverse the direction of the airflow through the furnace. <br /> Bon. Instructions for Model SC (Figure 4A) <br /> To protect the unit during shipping,blower models have special sup- 1. Remove screws"A".Lift each baffle slightly and slide forward,re- <br /> ports that must be removed before installation.Follow these instruc- moving each completely from the heat exchanger. <br /> tions to remove: 2. Remove screws"B"and the rear top baffle support assembly.Re- <br /> Blower Support Legs-Remove the blower support legs and screws. position the assembly on the opposite end of the heat exchanger and <br /> Motor Shipping Block-Remove the wooden block located under the attach. <br /> motor bracket.Find the two rubber pads shipped in the instruction 3. Remove screws"C"and the assembled bottom baffle support and <br /> envelope.Place these pads on the ends of the motor bracket bolts. brackets.Plug the holes in the heat exchanger bottom by re-inserting <br /> Motor Shipping Plate - Units that are equipped with motors of the screws in the holes.Position the assembly on the opposite end of <br /> 1-1/2 HP or less have a metal shipping plate attached between the the heat exchanger and attach using field-supplied sheetmetal screws. <br /> motor and the blower housing. The shipping plate must be re- 4. Re-install all of the individual baffles by reversing Step 1. <br /> moved and the plate and screws discarded.On units factory equipped <br /> with an optional belt guard,the belt guard must be removed to reach Figure 4A- Screws B Top Baffle <br /> the shipping plate. Model SC ` , Support <br /> Concentric Adapter Kit- Required for All v <br /> Installations �,� `����` <br /> The concentric adapter assembly and venting/combustion air kit(Op- /' <br /> tion CC2 or CC6)is required on all separated combustion models.It _.")1is shipped in a separate carton.Be sure that the concentric adapter ...'� <br /> carton is at the installation site.(See parts list in Paragraph 13.) \\ <br /> _ �� <br /> i \ <br /> Options `Screws A <br /> Some gas control options have parts either shipped loose with the 1 Ae�o <br /> heater or shipped separately.If your unit is equipped with any of the v ofT."4tt <br /> ' <br /> following gas control options,be sure these parts are available at the Le ftp .`j <br /> job site. <br /> ,; <br /> Heating Gas Option AG7 $ass as-40 eQ�e <br /> Control Option Thermostat P/N 48033 BaffleBott \\.. �`Nt9 <br /> Makeup Air Gas Option AG3 Supportlei" y" Screw C <br /> Control Options Control Switch,P/N 29054 <br /> Option AG9 Instructions for Models HSC (Figure 4B) <br /> (If an optional Remote Temperature Selector,P/N 48042 screws <br /> remote console Control Switch,P/N 29054 & Figure 4B-Model HSC <br /> is ordered,the Option AG15 <br /> control switch Remote Temperature Selector,P/N 115848 Remove screws and <br /> and,if requested, Stage Adder Module,P/N 115849 !i . , \ the rear top baffle. <br /> the temperature Control Switch,P/N 29054 �-, Re-position in the <br /> selector are Option AG16 1 \ �. opposite end of the <br /> mounted on Remote Temperature Selector,P/N 115848 heat exchanger and <br /> "�.� -. --I " attach. The baffle <br /> the console.) Stage Adder Module,P/N 115849 i ��r� �' must be located on <br /> Remote Disp lay Module,P/N 115852 <"' `'Goof ��., the entering air side of <br /> Control Switch,P/N 29054 94'4,4, . the heat exchanger. <br /> Option AG39 `� <br /> Remote Temperature Selector,P/N 174849 \\ s��e <br /> Before beginning installation,be sure that all other shipped-separate '' .-",v- <br /> --.1..-- � <br /> optionsro- <br /> ordered are available at the site,also.Depending on the model <br /> of heater,shipped-separate options could include a downturn nozzle, Reversal of the directional air baffles is complete,and the furnace must <br /> a KVA transformer,a shutoff valve,a condensate drain,a thermostat, now be installed with the air flowing from right to left when facing the <br /> a remote console,a manual fan switch,or high temperature vent sealing control compartment. ' ;" ,\ <br /> tape. <br /> Form 406,Page 4 Ax/ {f <br /> )(9 <br /> i, R <br />