Laserfiche WebLink
Achilles Manufacturing—Axthelm Construction JN 10076 <br /> October 4, 2016 Page 5 <br /> particles passing the No.200 sieve should be measured from that portion of soil passing the three-quarter-inch <br /> sieve. <br /> ADDITIONAL SERVICES <br /> In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide geotechnical <br /> consultation,testing,and observation services during construction. This is to confirm that subsurface conditions <br /> are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation <br /> construction activities comply with the general intent of the recommendations presented in this report, and to <br /> provide suggestions for design changes in the event subsurface conditions differ from those anticipated prior <br /> to the start of construction. However,our work would not include the supervision or direction of the actual work <br /> of the contractor and its employees or agents.Also,job and site safety, and dimensional measurements, will <br /> be the responsibility of the contractor. <br /> During the construction phase, we will provide geotechnical observation and testing services when requested <br /> by you or your representatives. Please be aware that we can only document site work we actually observe. It <br /> is still the responsibility of your contractor or on-site construction team to verify that our recommendations are <br /> being followed,whether we are present at the site or not. <br /> LIMITATIONS <br /> The analyses,conclusions, and recommendations contained in this report are based on site conditions,as they <br /> existed at the time of our site visit. If the subsurface conditions encountered during construction are significantly <br /> different from those anticipated, we should be advised at once so that we can review these conditions and <br /> reconsider our recommendations where necessary. Unanticipated soil conditions are commonly encountered <br /> on construction sites. Such unexpected conditions frequently require making additional expenditures to attain <br /> a properly constructed project. <br /> This report has been prepared for the exclusive use of Achilles Manufacturing,Axthelm Construction and their <br /> representatives for specific application to this project and site. Our recommendations and conclusions are <br /> based on the site materials observed and on previous experience with sites that have similar observed <br /> conditions. The conclusions and recommendations are professional opinions derived in accordance with <br /> current standards of practice within the limited scope of our services. No warranty is expressed or implied. <br /> We trust that this report meets your immediate needs for the proposed development. Please contact us if we <br /> can be of further service. <br /> Respectfully submitted, <br /> GEOTECH CONSULTANTS, INC. <br /> 6 $TON S1. <br /> 4c� og W4sy��c v ' <br /> 474, <br /> 4,36094t•N <br /> s`SIONG ,.., <br /> 10/4/•2026 <br /> James H. Strange, Jr., P.E. <br /> Associate JHS:jhs <br /> GEOTECH CONSULTANTS,INC. <br />