Laserfiche WebLink
00104,,,,,a <br /> .y <br /> 040,...4 <br /> Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> ----__TO BE COMPLETED BY APPLICANT <br /> Z Project Information • <br /> Property Owner Name: Michael&Megan Lucas <br /> Project Address: 711 90th PI SE Parcel# 00605900003600 <br /> City: Everett State: WA ZIP: 98208 <br /> Day Phone: (206)276-6213 <br /> Contractor Name Smart Energy Today <br /> Contractor License#: SMARTET869RJ <br /> ,Contractor Day Phone: 360-339-6660 <br /> PV system description Installation of 9.86kW residential rooftop solar PN system with <br /> (include manufacturer micro-inverters equipped with automatic rapid shutdown <br /> and model#of PV (34x) Modules- Itek Energy IT290-SE <br /> modules and (17x) Micro-Inverter-Blue Frog Solar YC500-MIW <br /> inverters): <br /> for Deter�mmilne if vow project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that ii2c ❑ <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by 17f ❑ <br /> the local jurisdiction. <br /> 3, Rooftop is made from lightweight material such as a single layer of composition shingles, ®' ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302.2] ir2f 0 <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to Ist 0 <br /> administer the electrical code.[IRC M2302.2] , <br /> 6. The installation shall meet the requirements of the International Fire Code as amended 121 ❑ <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system is designed for the wind speed'of the local area,and will be installed per V Q <br /> the manufacturer's specifications.[IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302,2.1(2)] 12/ 0 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds persquare foot. fIRC M2302.2,1(3)] NI/ ' 0 <br /> Enter total dead load of system(lbs/ftz): <br /> 10, To address uplift,modules are mounted no higher than 18"above the surface of the q ❑ <br /> roofing to which they are affixed. [IRC M2302,2.1(4)] <br />