Laserfiche WebLink
OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR <br /> PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> 0 Project Information <br /> Shel on Property Owner Name: Steve Sturm <br /> Project Address: 226 96th PI SE Parcel# <br /> Cit Everett State.lin ZIP98208. <br /> Day Phone: (425)308-1809 <br /> Contractor Name A&R SOlar <br /> Contractor License#: RSOLAS*903JM <br /> Contractor Day Phone: 206-707-9937 <br /> PV systemescrip n Installing a 6.6kW Photovoltaic System on the roof. <br /> (include manufacturer (22) Itek Energy 300W <br /> and model#of PV (11) Blue Frog <br /> modules and <br /> inverters): <br /> 0 Determine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1.., PVsystem is designed and proposed for a detached one-or two-family dwelling or <br /> Nwnhbuse not more than three stories above grade or detached accessory structure that ri <br /> Code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by Mf <br /> the local jurisdiction. au <br /> 3. Rooftop is made from lightweight material such as a single layer of composition shingles, ri <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302.2] 0 <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to 0 <br /> administer the electrical code. [IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended 0 <br /> by WA State. [IRC M2302.2] <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per <br /> the manufacturer's specifications.[IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] 0 <br /> 9. Total dead load of modules,supports, mountings,raceways and all other appurtenances <br /> weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] <br /> Enter total dead load of system(lbs/ft2):: <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the <br /> roofing to which they are affixed. [IRC M2302.2.1(4)] <br />