Laserfiche WebLink
ORDINANCE NO. /6.67-14 <br /> AN ORDINANCE creating a special <br /> construction fund entitled "Forest Park <br /> Swim Center Reroof" Fund 370 , authorizing <br /> the design and replacement of the Forest <br /> Park Swim Center roof and incidental <br /> improvements . <br /> WHEREAS, there exists a critical need to replace the <br /> existing fabric roof that was wind damaged beyond repair ; and <br /> WHEREAS, the Council authorized the hiring of an architect <br /> for the swim pool roof and supporting improvements; <br /> NOW, THEREFORE, BE IT ORDAINED BY THE EVERETT CITY COUNCIL <br /> THAT: <br /> Section 1 : A special construction fund is hereby established <br /> as Fund 370 entitled "Design and Construction of <br /> the Forest Park Swim Center Reroof" , to <br /> accomplish the actions authorized in subsequent <br /> sections of this ordinance. <br /> Section 2 : Authorization is hereby granted to the Director <br /> of City Services, under the administration of the <br /> Mayor , to design and construct the Swim Center <br /> Reroof project to include replacing existing <br /> fabric roof with a permanent roof , lighting, <br /> reglazing of existing doors , acoustical <br /> treatment , revisions to heat and vent systems , <br /> entry vestibule, bathhouse heat and vent and <br /> incidental remodel as determined by the Director <br /> of City Services . <br /> Section 3 : The total cost of the improvements authorized is <br /> $606 ,062 which shall include all costs related to <br /> design, construction, contract administration, <br /> plan development, and associated costs. <br /> Section 4 : A. The sum of $606 ,062 is hereby appropriated <br /> from Fund 370 , "Design and Construction of <br /> Forest Park Swim Center Reroof" . <br /> B. Source of Funds - Fund 370 - Cash on Hand. <br /> Section 5 : The City Treasurer of the City of Everett is <br /> hereby authorized to negotiate a reasonable rate <br /> of interest and issue interest bearing warrants <br /> to satisfy interim construction costs not to <br /> exceed $606,062 . These interest bearing warrants <br /> shall be redeemed by the Treasurer at completion <br /> of the project . <br />