Laserfiche WebLink
• <br /> b. Program 291 , Lombard Bridge Replacement Preliminary Engineering <br /> 1. Appropriation $ 50,000 <br /> 2. Source of Funds <br /> BRM $40,000 <br /> Local $10,000 <br /> c. Program 292 , Everett Avenue Signal Coordination and Timing Design <br /> 1. Appropriation $ 16,000 <br /> 2. Source of Funds <br /> TQX (Federal Demo) $16,000 <br /> d. Program 293 , 1984 Interim Traffic Signal Improvements Including <br /> Span Wire Signal Installations, Detectin, Turning Movement Indication <br /> Improvements <br /> 1. Appropriation $ 65,000 <br /> 2. Source of Funds <br /> Y4 Gas Tax $65,000 <br /> e. Program 294 , Pacific Avenue Rubber Railroad Crossing Installation <br /> 1. Appropriation $100,000 <br /> 2. Source of Funds <br /> FAUS $82,000 <br /> Y4 Gas Tax $18,000 <br /> f. Program 295 , 1984 Pedestrian Path Improvements <br /> 1. Appropriation $ 75,000 <br /> 2. Source of Funds <br /> Y4 Gas Tax $75,000 <br /> g. Program 297 , Hewitt Bridge Replacement Preliminary Engineering <br /> 1. Appropriation $100,000 <br /> 2. Source of Funds <br /> BRM $80,000 <br /> Local $20,000 <br /> h. Program 298 , Oakes Bridge Replacement Preliminary Engineering <br /> 1. Appropriation $ 50,000 <br /> 2. Source of Funds <br /> BRM $40,000 <br /> Local $10,000 <br />