Laserfiche WebLink
7 <br /> / <br /> INSPECTION REPORT <br /> / � Lk <br /> c Date ( Permit:C - aO 62-0 <br /> Contractor: <br /> r\ <br /> ��/ Owner: Re <br /> Site Address: ? 3O -. c S'-G -..., <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLU BING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab roundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In w Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑BuildingFinal ❑Gas Pipe Final ❑HWT Final <br /> 1 <br /> OTHER OR CONSULTATION: 25 --).-ClrrO Lk 2-3S <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> II OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> r El <br /> FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> ""' 6 Z7(l°, .. <br /> Inspector: / Date: 2.. - 2_ b 7 <br /> EIR(10/06) D TABAR,INC. <br />