My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3305 31ST DR 2018-04-11
>
Address Records
>
31ST DR
>
3305
>
3305 31ST DR 2018-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2018 9:14:41 AM
Creation date
4/11/2018 9:14:38 AM
Metadata
Fields
Template:
Address Document
Street Name
31ST DR
Street Number
3305
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 16 <br /> Public Works Permit#: PW1609-006 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: C1604-022 <br /> J Everett, WA 98201 <br /> .� ; Planning Reference#: SUB14-006 <br /> (425) 257-8810 <br /> Public Works Fee$: $ 416.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> POLYGON WLH LLC PNW Riverfront LLC <br /> 11624 SE 5TH ST 11624 SE 5th Street#200 <br /> BELLEVUE WA 98005 BELLEVUE WA 98005 <br /> PHONE: PHONE: 4255867700 <br /> TAX PARCEL ID# SITE ADDRESS: 3305 31ST DR LOT 187 <br /> NEW TOWNHOME/TRAFFIC MITIGATION <br /> THIS PERMIT COVERS SITE WORK FOR THIS TOWNHOME. <br /> THIS PERMIT COVERS TRAFFIC MITIGATION FOR THIS UNIT <br /> LOT 187 PLAT OF THE TOWNS AT RIVERFRONT <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior w <br /> to starting construction and with other inspection requests. <br /> 6. Install any erosion control measures as determined by the Public Works Inspector, [�I <br /> such as silt fence, straw bales, swales, or erosion blankets. <br /> 7. Connect side sewer per City Standard#'s 601 through 604. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. All excavated material from foundation, sidewalk, and driveways shall be hauled to an O <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 11. Driveway to Garage shall be paved. <br /> 12. The City will not issue a Building final or Certificate of Occupancy until the new <br /> sidewalk is installed along this property's frontage. <br /> 13. Test rolling with a loaded dumptruck and observation by the Geo-tech is required <br /> prior to setting forms. <br /> Public Works Permit Fee Breakdown: <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> Driveway $25.00 <br /> Traffic Mitigation $351.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> 8l / City of Everett from any and all claims for damages,costs,expenses,or <br /> TO causes of action that may arise because of installation and maintenance of the <br /> A oved for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> p remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date 98a11(2 <br /> --- <br /> Approved as Constructed gnature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.