Laserfiche WebLink
INSPECTION REPORT <br /> , _ i Date\4'(21 In Permit: C 1(0614— cn <br /> ` Contractor: D COY\-PX _ <br /> /'')/'-' <br /> Owner: VC)1, -(02(1, <br /> Site Address: .► 10 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork LI Footing CgRough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> LI Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Fin(alll ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 4246' EV t I ? (jV <br /> i1 <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> II] OK I=1OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> e I t 0/10 <br /> --F, <br /> Inspector: p Date: Lp _2 7 / <br /> EIR(10/06) DATAB ,INC. <br />