Laserfiche WebLink
INSPECTION REPORT 1 5(' 4 L3r" <br /> _ Date?' (_(. Permit: Q U/09 — C0 <br /> 'Z \`>c Contractor: ��J <br /> Owner:t <br /> Site Address: 33( \ 3(s-r- <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Te p Service ❑UFER ground ❑Groundwork/Slab [1 Groundwork/Slab <br /> roundwork ElFooting El Rough In El Rough In <br /> lab/Conduit ❑Foundation <br /> [1]Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid LI Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final � _❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: LkZ `{C Co `2_3 S <br /> PROVAL <br /> III <br /> PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. <br /> IIION REQUESTED <br /> ❑ OK FOR C.O. <br /> ID OK <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ElCALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: /1Date: ' <br /> ( <br /> HR(10/06) - DATABAR,INC. <br />