Laserfiche WebLink
* INSPECTION REPORT ` )A -3 <br /> / vrim- r <br /> Date I/ 11 Permit: CUO 14-&(° <br /> Contractor: C)W» <br /> Owner: pmco <br /> Site Address:` _ "�?? DIS <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑� jeiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains flding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: J!e6` 1 ,11-2,1 <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS pE•MI- -; <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED /�/. <br /> ❑ OK FOR C.O. ❑ VIOLATION �/ <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: e,K Date: q'' -)4 -J <br /> EIR(10/06) DAT BAR,INC. <br />