Laserfiche WebLink
INSPECTION REPORT <br /> /d� Date 1 1 1 3 Permit: C I (DO 1 -- 012- <br /> ... <br /> 1 <br /> Contractor: <br /> Owner: P1') ) �1 ` k <br /> Site Address: O V l 0 VI. 717'7 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit '-oundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In tructural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service 1 Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid 0 Drywall Nailing ❑Plumbing Final <br /> ❑Electrical FinalShear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> 4PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ K FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> c_c C ISS <br /> IA <br /> Inspector:____ADate: <br /> EIR(10/06) 0• ABAR,INC. <br />