Laserfiche WebLink
Simple Heating System Size: Washington State <br /> This heating system sizing calculator is based on the Prescriptive Requirements of the 2012 Washington State Energy Code(WSEC)and ACCA <br /> Manuals J and S.This calculator will calculate heating loads only.ACCA procedures for sizing cooling systems should be used to determine cooling <br /> loads. <br /> The glazing(window)and door portion of this calculator assumes the installed glazing and door products have an area weighted average U-factor of <br /> 0.30. The incorporated insulation requirements are the minimum prescriptive amounts specified by the 2012 WSEC. <br /> Please fill out all of the green drop-downs and boxes that are applicable to your project.As you make selections in the drop-downs for each section, <br /> some values will be calculated for you.If you do not see the selection you need in the drop-down options,please call the WSU Energy Extension <br /> Program at(360)956-2042 for assistance. <br /> Project Information Contact Information <br /> Unit G Townhome Polygon Northwesaompany:, <br /> Eclipse JamieAebrey <br /> Everett,Wa (425)5$b-7700:: :.' <br /> Heating System Type: Q Forced Air Furnace 0 Heat Pump <br /> To see detailed instructions for each section,place your cursor on the word"Instructions". <br /> Design Temperature <br /> Instructions Design Temperature Difference(AT) 47 <br /> H Everett IC AT=Indoor(70 degrees)-Outdoor Design Temp <br /> Area of Building <br /> Conditioned Floor Area <br /> Instructions Conditioned Floor Area(sq ft) 1,960 <br /> Average Ceiling Height Conditioned Volume <br /> Instructions Average Ceiling Height(ft) 8.5 16,660 <br /> Glazing and Doors U-Factor X Area = UA <br /> Instructions 0.30 295 88.44 <br /> Insulation <br /> Attic U-Factor X Area = UA <br /> Instructions i R-49 La� 0.026 872 22.66 <br /> Single Rafter or Joist Vaulted Ceilings U-Factor Area UA <br /> Instructions _- ... <br /> I I No Vaulted Ceilings in this project y --- - <br /> Above Grade Walls(see Figure 1) U-Factor Area UA <br /> Instructions0.056 1,883! 105.45 <br /> jR_21 y <br /> Floors U-Factor Area UA <br /> Instructions <br /> ' R-30 0.029 570:'„' 16.53 <br /> :ff <br /> Below Grade Walls(see Figure 1) U-Factor Area UA <br /> Instructions <br /> No Below Grade Walls in this project. <br /> Slab Below Grade(see Figure 1) F-Factor Length UA <br /> Instructions - --- --- - - _-� <br /> [No Slab Below Grade in this project V j <br /> Slab on Grade(see Figure 1) F-Factor Length UA <br /> Instructions I <br /> R-1 o Perimeter 0.540 88 47.52 <br /> 1 � . <br /> Location of Ducts <br /> InstructionsDuct Leakage Coefficient <br /> I I conditioned Space 7.1 1.00 <br /> Sum of UA 280.60 <br /> Envelope Heat Load 13,188 Btu/Hour <br /> Figure 1. Sum of UA XAT <br /> Air Leakage Heat Load 8,457 Btu/Hour <br /> VolumeX 0.6 X5TX.018 <br /> Above Grade Building Design Heat Load 21,645 Btu/Hour <br /> -'- Air Leakage+Envelope Heat Loss <br /> Building and Duct Heat Load 21,645 Btu/Hour <br /> Ducts in unconditioned space:Sum of Building Heat Loss X 1.10 <br /> Ducts in conditioned space:Sum of Building Heat Loss X 1 <br /> Maximum Heat Equipment Output 30,303 Btu/Hour <br /> Building and Duct Heat Loss X 1.40 for Forced Air Furnace <br /> Building and Duct Heat Loss X 1.25 for Heat Pump <br /> (07/01/13) <br />