Laserfiche WebLink
INSPECTION REPORT ���� <br /> ,�.44AQ� \( 'O a <br /> / � Date U ± _ 7 Permit: <br /> Contractor: <br /> Owner: fô <br /> Site Address: .3* 3(51l— b t <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Serviceaming ❑Rooftop Units ❑Water Service <br /> ❑Grounding Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ['Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ s K FOR C.O. ❑ VIOLATION <br /> PI UNABLE TO PERFORM INSPECTION: <br /> • ALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 31_I \ i)e <br /> • <br /> Inspector: Date: f <br /> BR(10/06) DATABA ,INC. <br />