Laserfiche WebLink
INSPECTION REPORT <br /> #Llw <br /> .,/ <br /> , Date f lh��/7 Permit: 577,03-f 33 <br /> Contractor: <br /> Owner: P 55�7 <br /> Site Address: 3 3444 3/s/- Pr <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> El Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ,&lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑GasPipeFinal ❑HWT Final <br /> OT R OR CONSULTATION: 42,5- S—( I• 272_--7 <br /> A ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P RMIT <br /> OK FOR T.C.O. ElCORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> C C W ° <br /> t 4 C5(rL____ <br /> --t7-1,---- ------1 <br /> /1°- <br /> Inspector: ----.---.-7<7 Date: ( / <br /> EIR(10/06) - D' ABAR INC. <br />