Laserfiche WebLink
INSPECTION REPORT <br /> �� Date (QI I' 7 Permit: al (-0() -e's° ( <br /> )7 <br /> 1..42 .:71, <br /> Contractor: <br /> Owner: 9z 0171 1 gg I <br /> Site Address: ..- L'Ill '✓ l 0 14. al V <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit Y Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ; ,;, ctural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service •Fra n •Roof p Units ❑Water Service <br /> El Grounding Ki1S i Iv� lag$ nical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> XAPPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> El OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION 24 hour notice required <br /> Inspector: Date: 1 I 1.—I <br /> EIR(10/06) � �DATABAR,INC. <br />