Laserfiche WebLink
INSPECTION REPORT <br /> Date ' `3 Permit: C.AO - OZ I <br /> Contractor. <br /> Owner: 6\e <br /> Site Address: 3 2-,\ ' 2\ - <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Stru. ral Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service i ■ r:ming ❑Rooftop Units ❑Water Service <br /> ❑Grounding 61 1 Insulation ;❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid .❑ Drywall Nailing �(,,, ❑Plumbing Final <br /> ❑Electrical Final Shear Nailing i/�T GAS PIPE <br /> SITE WORK " •Roof Nailing l Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> I 3 7 <br /> 7 , (-- <br /> g 3 J t, <br /> /� t <br /> Inspector: X Date: ` / 1/7 <br /> EIR(10/06) DAIABAR,INC. <br />