My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
420 47TH ST SE 2015 2025-07-17
>
Address Records
>
47TH ST SE
>
420
>
420 47TH ST SE 2015 2025-07-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 3:07:54 PM
Creation date
4/12/2018 3:19:06 PM
Metadata
Fields
Template:
Address Document
Street Name
47TH ST SE
Street Number
420
Permit
CW1505-002
Year
2015
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. <br /> Date 9/ZZ/iv <br /> Contact 57-‘_,VE <br /> Address 427 1.--779) S7 / <br /> City y/677 ArA '767.(27 <br /> Subject: Project: <br /> Job Address: 4Zo -r6 <br /> Plan Check No: We /009 - 00/ <br /> Dear /Ili /-14L-6 • <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building issues only. Additional revisions or additions may be required <br /> by other departments (such as Utilities, Planning or Fire). All references refer to the (2009 <br /> International Building Code,) (2009 International Residential Code,) as amended by the State of <br /> Washington and/or Washington State Energy Code 2006 Edition, and adopted by the City of <br /> Everett,unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to provide <br /> the Building Division with two new complete sets of drawings reflecting the corrections <br /> requested. <br /> Please prepare a response letter showing where each item in this correction letter is <br /> addressed on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email:jheilman@ci.everett.wa.us <br /> kcollison/heilman/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.