My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST 2017 PARKS HALL Plans 2022-11-02
>
Address Records
>
TOWER ST
>
2000
>
PARKS HALL
>
Plans
>
2000 TOWER ST 2017 PARKS HALL Plans 2022-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 2:46:42 PM
Creation date
4/13/2018 9:40:08 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
PARKS HALL
Permit
B1704-056
Year
2017
Notes
EVCC PARKS HALL INTERIOR REMODEL OF STUDENT LIFE BUILDING
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i I <br /> DC�O� �O�R FRANiE F� E�.��. DETAIL HD�lR E�IT P�1�llEFt AL ALUMINUNI NR NON-RATED <br /> D��� N�. ��) �N) ��) TYPE SIZE � x � �ATL TN�. TYP� �.�T1. T1N� S�'�I�R NEAD J�4i�� SILL G��UP DE�I�� �IJPP�.Y �'�M�E�VTS D��R N�TES <br /> �L FLUSH DO�R ST STOREFR�NT DOOR �� 1011 SW Klickitat Way, 5uite 208 <br /> 202 NOT USED Seattle,WA 98134 <br /> • �R FRAME STL STEEL P: 206.63�.�442 � wrww.�ai�s.��m <br /> 203A �1 A 3'- 0"X 7'-0" HM 0'-1 3/4" A HM 1/4.1 2/4.1 3/4.1 HL HALF-LITE DOOR WD WOOD <br /> 2036 R- 10 SEE A2.1 DOOR CHART HM HOLLOW METAL (�) EXISTING <br /> 204A N B 3'-0"X 7'-0" HM 0'-1 314" � HM 1/4.1 2/4.1 3/4.1 Y WSUL INSULAT�D (�1) NEW <br /> 2048 N � 3'- 0°X 7'-0° HM 0'-1 3/4" B HM 1/4.1 2/4.1 3/4.1 MATL MATERIAL (Y) YES <br /> 205 N�T USED - NOM NnMINAL (R) RELOCATED/ REUSED <br /> 206 NOT USED - <br /> 207 R-6 SEE A2.1 DOOR CHART <br /> 208 NOT USED - SEE WALL TYPE <br /> SEE INALL TYPE <br /> 209 NOT US�D - <br /> 209A STORE FRONT D 3'-0"X 7'-0" AL AL � USE TEMPERD GLASS FOR ME7AL STUD ���� �E+�tS�'���'� <br /> ENTIRE STO�EFRONT GLAZING <br /> ��G�! ��� <br /> 210 R-1 ;EE A2.1 DOOR CHART G.W.�. <br /> 211 R-3 SEE A2.1 DOOR�NART METAL STUD <br /> �� G.W.�. ' J� Y �: �]�B�F�t� <br /> . 1/2 �T�7'�C��WA�NI�dG�"��3 <br /> 212 1�-2 SEE A2.1 DOOR CHART <br /> (TYP} METAL S`fUD HEAnER 1/2�� DOUBLE METAL STUD JAMB <br /> �'' SEALANT(BOTH SIDES) (TYP} <br /> 213 R-7 SEE A2.1 DOOR CHART -� SEALANT (BOl"H SIDES} <br /> ' � DOOR FRAME PER D R � , � DOOR FRAME PER DOOFt <br /> 214A R�8 SEE A2.� DOOR CHART i I 00 SCH�DUL� i SCHEDULE <br /> 214B N C 3'- 0"X 7'-0" HM � C HM 4/4.1 5/4.1 6/4.1 SUSPENDED POCKET DOOR- NO ; I, � ' <br /> SILL TRACK ! , DOaR PER D�OR SCHEDULE � <br /> ; DOOR PER DOOR SCHEDULE <br /> '�JA�L TI�PES <br /> 1 Dt��R HE� D T�IL � D��� J��l DETAlL <br /> A4.1 SCALE: 1- 1/2"= 1'-0° A4.1 SCALE: 1- 1/2"= 1'-0° <br /> 3-5/8° M�TAL STUDS <br /> AT 16" O.C. � � 3-5/8" METAL STUDS <br /> �,, ! : (E) 8"CMU WALL AT 16" O.C. <br /> 5/�"TYPE 'X' �.W,B. �'� ' (E) 8"CMU WALL � ' <br /> (EACH SIDE) ' ' � ; 1-1/2" FURRING CHANNELS � 5/8" 7YI'E 'X' G.W.B. SEE WALL TYPE <br /> � �, 3-5/8" METAL STUDS ; � AT 16" O.C. �, 3-5/8" METAL STUDS <br /> AC�USTiCAL BATT ' ' AT 16° O.C. � I 20 GA 3-5/8 METAL STUDS C,/,� <br /> � i I I 5l8" TYPE 'X' G.W.B. AT 16° O.C. STAGGERED AT 16" O.C. <br /> ' � i 5/8" TYPE'X' G.W.�. ; „ , , �� � , , �EE WALL TYPE _ <br /> � 5/$ TYPE X G.W.B. 51$ TYPc XP G.W.B. (WATER � <br /> , � I, R�SISTANT) <br /> i / ,�' �' �� � � i M ETAL STU D � <br /> 3-5/8" f�ETAL STUDS , � ACOUSTICAL BATT 5l� TYPE X G.W.B. i�l ! DOOR FRAME AND ANCHORAGE G.W.B. � <br /> 1 � <br /> . �� i j � <br /> �A 4 METAL Sl"UDS NOTE: WATER RESISTANT G.W.�, i ; METAL STUD HEADER <br /> � <br /> IN MOISTURE PRONE AREAS METAL STUD WALL @ (E) CMU LIVINC WALL j ; DOOR PER DOOR SCMEDULE �/2 <br /> �B 5 1/2�� METAL STUDS 2 3 4 5 ; ! TYP) � <br /> � i � � <br /> � � FINISH FLOORING �� <br /> � i � SEALANT (�OTH SIDES) � ;� <br /> i ' � , � �� <br /> i � `�'"' � � ; DOOR FRAME PER � <br /> D �'IEC� LE � � ~ I i DOOR SCHEDULE � � <br /> ��� SC U <br /> � � � � <br /> I �� 6' �� <br /> � � DOOR PER ; I� � � `� � � <br /> � D�OR SCHEDULE � I � � �� <br /> SEE SCHED. SEE SCMED. S�� SCHED. ! I � � � �'� <br /> � � <br /> � 2 ' �� � 2�i 3 D�� SILL �ET��L � � <br /> � A4.1 a4., �. � P�CI�ET ���� HE�� E��1LS � � �_ <br /> A4.1 �,4.� SCALE: 1- 1/2"= 1'-0° w r� <br /> �� <br /> A4.1 SCALE: 1- 1/2"= 1'-0° <br /> . �� �� �� �� � � <br /> � � <br /> � G.W.S. <br /> 2 `� 2 `�' - � METAL STUD � <br /> A4.1 A4.1 I � A4.1 <br /> DOUBLE METAL <br /> I I STUD JAMB <br /> ( ( ' � HOLLOW WALL � <br /> ; ; <br /> ; <br /> � � � ' '�, INTERiOR GLAZING, �E: �RAME � �� ° � <br /> � v � II a � �YP�S N � � � <br /> v� u� cn ' � � � � <br /> w w � � Lu � , � � <br /> w W w I i , <br /> u� cn cn I : ', � <br /> I _ �� � <br /> � � � <br /> I � _ '�� i `. � <br /> I <br /> d- �- I ; ' DOOR PER DOOR SCHEDUL� 1 5/8" STU[� <br /> � � O `- � � '' I ; DOOR PER DOOR SCHEDUL� <br /> DOOR FRAME PER DOOR <br /> 3 3 s SCHEDULE <br /> A4.1 A4.1 A4.1 � <br /> C- P�CKET DOOR 4a D��R J��� DETA�L ( JAM� S�MILA�2} 5 P���ET D��R JA�M� �ET��L <br /> Aa ��LID DOOR� FLUSH �- FULL LIT� WIT� ��IVA�Y �LAS� WITH P�IVACY GLASS A4.� scaLE: �- ��2°= ��-o" A4.1 SC,4LE: 1- 1/2°_ ��-o° <br /> d�OR AND F�AME TYPES sEE w��L TYPE <br /> � � � � <br /> � ; � <br /> , ; <br /> , i ; <br /> � INTERIOR GLAZING, RE: FRAME � <br /> ; <br /> �� �- ° � " � TYPES � ! DOOR FRAME AND ANCHORAGE <br /> 6 0 9-1 ; ; I � <br /> ; <br /> �� � �_ �� � �� �_ �� � �� i ' � <br /> , 3 3 3/S 2-1 1 2 1 1 3-� 3 l� 1'-10 3/4" 1'-10 3/4" 1'-10 3/4" 1'-10 3/4° � ' ' � � � <br /> I ' � ' ' i <br /> � o � I ' � DOOR PER DOOR SCHEDULE <br /> � , � I <br /> , <br /> �� �� �. .� _ , � ; j , <br /> o � <br /> \\ � FINISH FLOORING <br /> ��. � � � �� � � �� � � I GLAZING BLOCK AND SEALANT � �, � <br /> � � �� � I '� � � � <br /> � � i � <br /> i i <br /> ' i t!3 <br /> I i <br /> \\ I � c .�-� <br /> \ .� o � <br /> •� � � <br /> 5A 4A \\ � U � <br /> A4.1 A4.1 \�, \ - \\ �� D��� �1�� T�IL 6 ��CKET D�J� �ILL ��TP�IL� � � � � o <br /> � o � � � <br /> 0 0 � A4.1 SCALE: 1- 1i2°= 1'-0" A4.1 SCALE: 1- 1/2"= 1'-0° ra- � �, <br /> .� <br /> �- � u� =; >, m <br /> `� � <br /> a� c� � v <br /> \\ o .�.� -� � � <br /> � � -� � � � <br /> � � � � � <br /> DOOR PER�OOR <br /> SCHEDULE <br /> Sheet Na /Title: <br /> \� \ FLOORING PER FINISH <br /> �� - �� \� - SCHEDULE w EXIST FLOORING TO ��. `� <br /> � � \ � � REMAIN. � <br /> � S�HED�LES <br /> W <br /> � <br /> � 0 � � � <br /> _ ��D D ET�I LS <br /> � <br /> N�TE: USE TEMPERED GLASS FOR TNL ENTIRE WINDOW/DOOR ASSEMBLY iVOT�: USE TEMPERED �LASS FOR THE ENTIRE WIND4W/DOOR ASSEMBLY <br /> sA D�OR SILL D�T�IL <br /> STORE F�ONT <br /> A4.1 SCALE: 1- 1/2°_ ��-o° Project#: 2017-090 G (1-1) <br /> 0 copyright 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.